Showing posts with label The Shack. Show all posts
Showing posts with label The Shack. Show all posts
Friday, May 7, 2010
Half the roof is done.
Thursday, May 6, 2010
Metal Roofing Started.
Saturday, May 1, 2010
Had Some Help Today.
Today I had me a helper. My 14 or 15?year old nephew Rylon. A bunch of people came out my way today to set out on a quadding trip and they left Rylon with me. And my mom. Mom was tying 2x4's to the rope, and Ry and I were pulling them up and nailing them on. I gave Rylon a bit of warning before we got started that it is pretty high up there and if he don't feel comfortable with it, don't be afraid to say so and all that. I do feel pretty stupid about it though. He climbs around up there like some kind of a squirrel. Really, I think the real squirrel was sitting back and taking lessons. I have never really worked with Ry much before and I am really quite impressed with how much of a help he was today. I just gotta pay the guy, and I think he's going to come out and give me a hand tomorrow again (Sunday) hopefully.
Rylon used to be pretty active in the rodeo scene. He won second at the Calgary stampede in the boys steer riding either last year or the year before that, I can't remember for sure, and he has picked up quite bit of cash from a bunch of other pro rodeos along the way. He's kinda getting out of rodeo scene and getting onto other things instead. The following Youtube video is of Rylon at play. And I thought he might be afraid of heights. lol.
Wednesday, April 21, 2010
The Other Overhang.
Well, I got the other overhang ladder framed in today. My tin roofing material that I ordered was'nt in yet, so I never did go to town today. I still have a bit of prep work to do before the tin anyway. Probably more than I even think. I was kinda hoping to have the tin on before we get any rain, but it sure looks like I could get some rain tonight. I know we could really use it here, but it would be nice if would hold off for a couple more days or three. lol. The wind is kinda testing things also. Sure hope she all holds together.
Tuesday, April 20, 2010
East Overhang Ladder
Sunday, April 18, 2010
Trusses are On.
I had a two guys helping me with these trusses and gable ends. It was a big day and I'm sure we will all feel it in the morning. There is still quite abit of work to do before I can put the tin on the roof, and I know it won't go real fast because of the height factor. We did'nt spend a whole lot of time on precision today, I just wanted it all up there while I had help. Thanks Johnny and Guy, I owe you guys one.
Saturday, April 17, 2010
Ready for Trusses
It's all sheathed and ready for trusses........I think. There are some spots on the sheathing that still needs nailing. I could'nt reach. Wrong ladder power and a partial trench in my way. If it were not for that, I almost feel like putting on the house wrap before the trusses, it would be alot easier for the top part that way. But I'm not going to, I just want to try and get a roof on before some major rains come. I just might have some help coming out tomorrow to help me with those trusses. But I am not going to hold my breath, for I know that it is Saturday night, and ya never know what could happen. (Thinking back of the way I was at one time). With help or with no help, the roof has to go on there somehow. If I were to do it myself, I was thinking about utilizing the winch on my quad and a snatch block. It would be time consuming by myself, but I'm pretty sure it would be quite doable.
The trusses are going to add 10 more feet and a little to my overall height. I hope the wind don't blow my house over. lol. Actually, it usually dos'nt get all that windy in here. Usually.
Friday, April 16, 2010
More Wall Sheathing Done.
Anyway, somehow I seemed to short change myself on wall sheathing, and I am going to make a quick trip into town for some of that and a shower, in the morning. Once I'm done with the sheathing, it is time to start with the roofing. I'm sure the roofing will have me doing a little thinking for a bit to get things started. I'm kinda scratching my head thinking up ways of getting my gable ends way up there.
Wednesday, April 14, 2010
Interior Walls and Loft Framed.
I have a bit more prep work before I put the trusses up. A smaller loft on the other side of the house.
Things have been drying up alot quicker around here than they usually do in the spring. I'm getting a little worried that soon work might get busy. Usually we're shut down for a couple months in the spring, but this could be one of those real short spring breaks. Possibly anyway. All I really care about is getting a roof on before some major weather.
Things have been drying up alot quicker around here than they usually do in the spring. I'm getting a little worried that soon work might get busy. Usually we're shut down for a couple months in the spring, but this could be one of those real short spring breaks. Possibly anyway. All I really care about is getting a roof on before some major weather.
I had a mouse in my shack for the last couple of days. When I first discovered this, I was on the phone when the dog was obviously after something. Then the mouse came out and started coming at me, I thought anyway. I let out a quick beller and jumped up on the chair. lol. It was a little imbarrassing, as I was on the phone. The following two mornings I watched the little guy touring around the shack at the other end from my bunk and I could hear him stirring around just as I was trying to go to sleep at night. As I was writing this blog I heard the mouse trap snap. Hopefully, that was the only mouse I had in here.
Wednesday, April 7, 2010
Tuesday, April 6, 2010
Walls Going Up
Today was a pretty long day. Lots of phyiscal work and up and down and all around. I can see that if there were a crew of a few people, something like this could have been done in a couple hours, but it took me pretty much the whole day and I was going pretty steady. I should sleep like a baby tonight.
Wednesday, January 20, 2010
Playing with the Basement Floor Again
Well I can kinda see the end in sight, of the foundation construction anyway. I still have a bunch of smaller little things to take care of before the inspection. I don't even want to say how long, because I am always wrong on that one anyway.

There are bunch of other things I'm wondering about also. I guess I'll just get mr permit man out here, and he can tell me what else needs to be done I guess. So far the permit people I have been dealing with have been quite helpful and good to get along with.
It is kinda neat to be at a stage where I can turn on some heat and be out of the snow and stuff while building. Just about half of the basement floor is insulated and ready to be permanantly screwed down. But I do have some little things to work around and seal off where the plumbing comes through, and the floor drain and at the sump. I guess I might have to build some stairs pretty quick once the floor is all done also. And then there are other little items that need done. It seems those little things takes up a fair bit of my time. To much thinking I guess.
There are bunch of other things I'm wondering about also. I guess I'll just get mr permit man out here, and he can tell me what else needs to be done I guess. So far the permit people I have been dealing with have been quite helpful and good to get along with.
It is quite unbelieveable to me that January is almost over. Wow how time has been flying. Life is really good out here. I could'nt even imagine living in town again. The solar energy situation is treating me pretty well, although I do fire the generator up occasionally, but I try to keep it to a minimum. It has been snowy and clouded over the last couple of days, so there will always be times where the panels ar'nt going to deliver fully. I am still so far from being tired of living in this little shack, that I am starting to wonder about myself, myself. I love it. I worked on the pay job for 4 short days all this month so far. It's nice to get a few days in of work ever month. So far between the rent income and a little bit of work, I have been living and building off of that income alone. I do expect that soon I will have to start dipping into the savings account a little bit. I can kinda predict some larger expenses coming my way soon. lol. Fridge, stove, tub, heating, water heating and on and on. Now I am depressed, but I will try to get over it soon. I don't have to finish the floors and stuff, but if I don't do it know, it will probably never get done.
I sure hav'nt been very active on the old computer lately again, I do jump on sometimes in the evenings and quickly glance at alot of my favorite blogs and stuff, but I have been spending most of my time in the evenings reading and educating myself on building issues. I have alot to learn as I plan on doing all my own plumbing, electrical, and whatever else. I get researching things and before I even know it, it is midnight and time some sleep.
Monday, January 4, 2010
Happy New Year, Anniversary and Birthday.
Happy New Year. Ya, I know it's late. I hope everyone had a good one, over the holidays. I also had an anniversary. Dec 28 2009, marked 5 years of no alcohol use for me. I pat myself on the back. I used to really like to drink, (usually rum and diet coke). then I quit, and turned into a hermit. lol. I also quit smoking, but I did'nt quit living. Alot of people who know me might look at me like I quit living, but right now I am living more than I have ever lived in my life. Just building on the cabin, living off the grid, and living in a small shack in arctic type weather. This is something I have dreamed for as long as I can remember. When I made the plunge at the end of October, there were times when I thought that by this time, I could possibly be regretting the move I have made. But there are absolutely no regrets on my end. I could'nt possibly turn back now. It just keeps getting better and easier all the time.
January 1 was also my dogs birthday. She is now 9. She has'nt been helping me much lately, usually she's just bundled up in the shack most of the day. I guess she is the smart one of the bunch. I have been building a few hours a day usually. However sometimes it's pretty cold in the morning and I usually do some planning and thinking then. I figure that -20C is cold enough to build in. If it is colder than that, I usually do other things such as planning my stairs or getting supplies in town. I hav'nt spent much time on the computer lately. There are times where I have gone a few days and not even turned it on, I just don't seem to have much time for that lately.
The shack is coming along slowly. It takes me a long time to get things done. Alot of the time I spend just researching stupid little things. Code, code, code. Right now my stairs down to the basement and up to the loft have got alot of smoke rolling out my ears. If I had my own way, it would just be a couple of ladders, done deal. If I ever do this again, I would maybe get someone to build me some blueprints. I guess those things can be pretty handy at times. lol. But I will get more satisfaction knowing that I designed and planned everything myself in the end. I think.
There's the basement so far.
A look from the inside. I'm going to need a good set of binoculars to see from one end to the other.

It was'nt all that long ago I used the old dodge and brought a new load of lumber home, and it is already covered in snow again. Seems we get alot of that around here lately, but it dos'nt even bother me anymore. Bring it on, let it snow, see if I care.
January 1 was also my dogs birthday. She is now 9. She has'nt been helping me much lately, usually she's just bundled up in the shack most of the day. I guess she is the smart one of the bunch. I have been building a few hours a day usually. However sometimes it's pretty cold in the morning and I usually do some planning and thinking then. I figure that -20C is cold enough to build in. If it is colder than that, I usually do other things such as planning my stairs or getting supplies in town. I hav'nt spent much time on the computer lately. There are times where I have gone a few days and not even turned it on, I just don't seem to have much time for that lately.
The shack is coming along slowly. It takes me a long time to get things done. Alot of the time I spend just researching stupid little things. Code, code, code. Right now my stairs down to the basement and up to the loft have got alot of smoke rolling out my ears. If I had my own way, it would just be a couple of ladders, done deal. If I ever do this again, I would maybe get someone to build me some blueprints. I guess those things can be pretty handy at times. lol. But I will get more satisfaction knowing that I designed and planned everything myself in the end. I think.
It was'nt all that long ago I used the old dodge and brought a new load of lumber home, and it is already covered in snow again. Seems we get alot of that around here lately, but it dos'nt even bother me anymore. Bring it on, let it snow, see if I care.
Monday, September 28, 2009
Basement Floor Framing
Thursday, September 24, 2009
Cistern and some Building Supplies.
I was able to get an earlier start this morning, but I did have to go and put a deposit on my trusses that I ordered. The day was windy. I had 5 packs of insulation all bundled into one and was laying loose inside the culvert. When I started down the hiway, I seen the wind pick up the bundle and haul it away. It hit the hiway and did a few bounces and rolls, and to my amazement, it all hung together in the bundle. I had visions of yellow insulation blowing all over a farmers field and the hiway, but I got lucky I guess. I can't even believe the wind picked that up. It is insulation, but it is pretty heavy the way it packed tightly like that. I had to go and get it out of the ditch, and it was hard work getting it back on. This time I tied it all down.
I am hearing some nasty rumors about some snow supposed to be coming on about Tuesday. Not really looking forward to that.
Tuesday, September 22, 2009
Almost Ready for Wood
The last few days I hav'nt been around very much. I stayed out at the acerage for a couple nights, then I went to the auction sale, then to work on my pay job. Tonight, I am going to sleep in my own bed for a change. I did have a glance at a few blogs, but I did'nt seem to have much time for commenting to many.
Friday, September 18, 2009
Larger Sump required.
And in other news, today I thought I had lost a friend for ever. Traction went missing in action. Traction, my dog, is almost 9 years old. She has started acting kinda weird awhile back when ever she hears gun fire, or at least I have noticed recently. Even when it is along ways away. It is almost as if she had been shot at before. Anyway, today the neighbor across the creek started doing some major target blasting. I can remember looking at traction, a quick glance when it first started and I reasured her that it is alright. But I was deeply involved with my cementing and went on with the task at hand. A while later I noticed Traction was no where to found. That is really odd of her not to come when I whistle. After a couple hours passed, I really started to think I was never going to see her again. Well I decided I was going to sleep there for the night, incase she did show up. I was sitting there, kinda accepting the fact that she is gone for ever. I decided to step outside my trailer with a flashlight, I did'nt whistle or call or anything, I was just standing there in the dark, and in the distance I heard the jingle of all her tags on the collar. Thought I was hearing things for bit, but then I heard it again, and it was getting closer and closer, I just knew it was her. I never really realized how much I could miss a stupid dog. I was kinda preparing myself for a few days of major sadness. She was missing for 4 hours or more all together. I wonder if there is a way of getting a dog to accept gun fire. I guess I learned to pay a little more attention to her next time this goes on. I sure do hope she gets used to it eventually.
Wednesday, September 16, 2009
Foundation Pipes
September 16
With a wood basement, the permit people clearly state "no weeping tile". So instead, I am going with this system. I did'nt need the pipes connected on the inside. I could have just left them to drain on the ground inside the footings in a bed of clean gravel, under the floor. I don't want any moisture under there if I can help it though. If I could have gone with normal weeping tile, the whole job would have been alot quicker. There would have been no cutting 2 inch pipe, no drilling 2 1/2 inch holes in the footing forms, no connecting all these pipes together. This does take alot more time, but that is the price to pay when one is frugal. (All this pipe was'nt exactly cheap either). lol. I'm estimating about $250 CAD for all the pipe and fittings for the foundation drainage. But once it is done, it is done. I am hoping that this whole system is just a backup and will never actually see water.
September 17
I got all the pipes around the inside perimeter attached. I just need to attach the four sides to the sump pit. Today was'nt real productive, not in the building department anyway. I had a bunch of other things that needed done first. My eye glasses needed repair, my washing machine blew up on me. (I had to replace a couple of belts, nothing too serious). A bunch more running around town for supplies and idea's.
I am getting pretty close to deciding on the water storage device that I will go with. I'm pretty sure it will be an 8 foot diameter corragated culvert type cistern. It will be a little more work to install, but it is less money for more gallons. I can also haul and handle it myself. I'm pretty sure my 410 backhoe would have a little trouble throwing a 1500 gallon concrete cistern into the ground. But this baby I think I can move somehow. They tell me that 1 meter of this pipe will hold about 1000 gallons of water. It costs about $475/meter. I'm thinking about getting 3 or 3.5 meters(about 11.5 feet) which would be roughly $1662.00. But I will have to spend a little more on some concrete for the botton of the cistern also. A 1500 gallon concrete cistern would be about $3600.00. Plus I would need the manhole extensions for extra money, and they would have to deliver and put it in the ground for me for even more extra money. I also looked into fiberglass and plastic ones. They are pricey also and kinda touchy installing it sounds like.
My sewage septic tank is probably going to be a concrete 750 gallon unit. About $1750.00 plus manhole extensions, pump, delivery and whatever else.
Anyway, for now, I am still working on my sump pit. I would like to get my cistern in soon, so that I can backfill the trench and get on with other things. I don't want to sound real picky here, but I am planning on doing a little bit of cementing along the outside of my footings, to get a bit of a slope away from the footings and also to fill in the low spots right along the footings, where water would love to accumulate. I honestly don't think many other builders would worry about something like this, maybe they would, I don't know, but I am going to experiment with it. It really should'nt take too much time (lol), but it will make me feel alot better about the whole foundation situation. Then it should be onto some wood going down.
Subscribe to:
Posts (Atom)