Showing posts with label Sheathing.. Show all posts
Showing posts with label Sheathing.. Show all posts

Saturday, April 17, 2010

Ready for Trusses



It's all sheathed and ready for trusses........I think. There are some spots on the sheathing that still needs nailing. I could'nt reach. Wrong ladder power and a partial trench in my way. If it were not for that, I almost feel like putting on the house wrap before the trusses, it would be alot easier for the top part that way. But I'm not going to, I just want to try and get a roof on before some major rains come. I just might have some help coming out tomorrow to help me with those trusses. But I am not going to hold my breath, for I know that it is Saturday night, and ya never know what could happen. (Thinking back of the way I was at one time). With help or with no help, the roof has to go on there somehow. If I were to do it myself, I was thinking about utilizing the winch on my quad and a snatch block. It would be time consuming by myself, but I'm pretty sure it would be quite doable.
The trusses are going to add 10 more feet and a little to my overall height. I hope the wind don't blow my house over. lol. Actually, it usually dos'nt get all that windy in here. Usually.

Friday, April 16, 2010

More Wall Sheathing Done.

I got the smaller loft in sort of. I know that there will have to be some modifications to it later for the wood stove chimney. So I left out one joist in the middle area. On this loft the joist spacing is 1 foot on center with 2x10 lumber. I don't have a wood stove yet, and am not real sure where the chimney will run exactly, so I did'nt mount everything to stay for ever. I could have totally left it out until the roof was on, but I am thinking that it will help with putting the roof on.
I was in the process of measuring my top plate for the truss spacing when I decided that maybe now would be a good time to finish sheathing the walls. (I know that I am a little backwards at times). It is a lot easier when I can do it from the inside. If I did this again, the walls would be completely sheathed before I stand them up, but I did'nt because I wanted to tie the split sections together with sheathing. It was quite a battle I had with some of this so far today, and I could'nt imagine doing it from the outside on a ladder.
My natural fridge is slowly disappearing. Today was the warmest we had this spring so far. I'm not sure what the temperature got to, but I'm sure it was well over 20 celcius. I had to go and put on a long sleave shirt eventually, because I thought I was going to scorch myself.

Anyway, somehow I seemed to short change myself on wall sheathing, and I am going to make a quick trip into town for some of that and a shower, in the morning. Once I'm done with the sheathing, it is time to start with the roofing. I'm sure the roofing will have me doing a little thinking for a bit to get things started. I'm kinda scratching my head thinking up ways of getting my gable ends way up there.

Thursday, January 14, 2010

Sheathing the Main Floor

I woke up this morning thinking that I should be able to have that whole main floor sheathed easily. But I was wrong. I ran out of glue, better known as lumber lock. Only a couple sheets left to go too. So I proceeded to do a bunch of a nailing, as I was just tacking down the edges as I was going.
I always meant to get a good shot of the main floor framing, but I always seemed to get real involved with things and forget until it was too dark. I moved a few sheets around just so I could get a picture of the stairwell framing. The rest of it is pretty basic. I am going to sheet right over the stairwell opening and leave it closed up for awhile, while I do things down below, in hopes of keeping the snow and rain out. I will cut it out when the time is right.
I gotta go to town later in the day tomorrow, so there is no point in going in the morning to get glue. I guess tomorrow will be more a day of non-thinking nailing. Give my poor old brain a bit of a rest. I'll finish gluing the floor on Saturday if weather and work allow for it. I have a few more things to do to the basement, then soon it will be time for my foundation inspection (hopefully this month sometime). I don't think there will be any new walls going up until that inspection is done.