I finally had a full day off from work, where it was'nt raining out. I hav'nt done very much on the house since my last post, a little here and there, but not much. Maybe I wont be in it before winter. lol. It was a pretty good run at work for awhile there and I did enjoy doing it, but I am truly getting the urge to do some serious building again.
Today I finally cut the main door out to it's correct size. It probably makes the house look smaller. A 36" left outswing door will go in that spot. I did a bunch of other smaller things to get ready for some wrap. Sealed all the gaps between the basement top plate and the main floor system. Had to do some adjustments on the door rough opening size and finish sheathing the strip around the house where the main floor is.

One last look at this side of the house before the housewrap goes on. This is the north side, and there is one basement window and one main floor window in the living area at the foot of the stairs that go up to the loft. I did'nt want a whole bunch of larger sized windows. When I am not at home, I am going to rely on a propane space heater in the basement to heat the whole house. This is the plan for now anyway. Our winters are sometimes pretty cold and long, and too many windows could result in more heat loss than I really want. There are more and one that is a bit larger on the south side.

I just started experimenting with the housewrap. I need to cut out another door and some windows, then I can finish wrapping it up. I really hope they can live without me at work tomorrow.

I am still trying to decide exactly what to do up here in the loft. Window or door. I know I probably have the technology to frame a door in there, but it's not quite that simple. That gable wall is a part of my manufactored trusses, and for me to just start wacking a hole in there for a door could cause some grief for me with with the permit guys. I may have to draw my plans up and get someone who is qualified to ok it for me. I guess that would be an engineer or maybe the truss manufactorer. I just hope it is not a complicated drawn out and expensive ordeal. It would be nice to have a door going out to the balcony though. This end of the house probably wont get completely wrapped right away. I am going to try and draw up a door framing plan soon. Any suggestions? The top part studs are at 2 foot on center and the bottom part is at 16".
Anyway, thats it for now. I will try and post a little bit more often, as I THINK things may be slowing down a tad at work. Hopefully.